Construction Update: January 23 to February 5, 2013

Posted by Fran Ware

During this period, Costello Construction Company:

  • Completed the trailer set up;
  • Excavated pad to 8';
  • Began testing borings;
  • Began fabrication of rebar cages for caissons;
  • Competed construction fence at Wayne Ave; and
  • Erected the temporary power shed.