Posted by Fran Ware
During this period, Costello Construction Company:
- Completed the trailer set up;
- Excavated pad to 8';
- Began testing borings;
- Began fabrication of rebar cages for caissons;
- Competed construction fence at Wayne Ave; and
- Erected the temporary power shed.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.